Documents and Reports

CEQA Postings

Basin “DM” Expansion Project (Posted August 15, 2022)
Public Hearing to Consider Adoption of the Mitigated Negative Declaration:

Interested persons are invited to attend a hearing at which the FMFCD Board of Directors will consider the adoption
of the final Mitigated Negative Declaration. The hearing will be held at the following date, time, and place, or as soon
thereafter as possible:

Time: 6:00 p.m.
Date: Wednesday, September 28, 2022
Location: Fresno Metropolitan Flood Control District Board Room,
5469 E. Olive Ave., Fresno, CA 93727

Comments on the Initial Study/Mitigated Negative Declaration:

Any interested person may submit written comments on the proposed Mitigated Negative Declaration and/or Initial
Study. Said comments will be reviewed by the FMFCD in considering the adoption of a final Mitigated Negative
Declaration for the Project. The review period is from August 15, 2022 to September 13, 2022. To be considered,
comments must be received by Tuesday, September 13, 2022.

Please submit comments to:
Joseph Draper
Fresno Metropolitan Flood Control District
5469 E. Olive Avenue
Fresno, CA 93727
(559) 456-3292, Fax (559) 456-3194
josephd@fresnofloodcontrol.org

Availability of Initial Study/Mitigated Negative Declaration:

The proposed Mitigated Negative Declaration is based on the finding that the Project will not have a significant effect
on the environment. The reasons to support such a finding are documented in the Initial Study prepared by FMFCD.
Copies of the Initial Study and all documents referenced therein may be reviewed at the links below:

Notice of Intent to Adopt a Mitigated Negative Declaration for the Basin “DM” Expansion Project
Mitigated Negative Declaration

Mitigated Negative Declaration – Basin DM Expansion Project

Initial Study – Basin DM Expansion Project